EXPERIENCE: Design/Build Electrical/Mechanical Systems

Photovoltaic Power System and Cooling Tower Replacement

Owner/Agency
US Fish & Wildlife Center

Location
Shepherdstown, WV

Project Type/Experience
Design/Build

Contract Value
$1,610,000

Contract Number
W912DR-10-C-0101

Description of Contract
Total replacement of an existing cooling tower. Replacement with a new 2 cell tower capable of 700 ton of cooling as well as upgraded piping to convert the system from closed to open loop. All new pumps, VFD, water treatment system and control system.

Greenfield installation of a 5 array photovoltaic system capable of generating 44.18 KW from 188 - 235w solar panels. Installation of new infrastructure to connect the photovoltaic’s to the existing electrical distribution center at the site.

Period of Performance
2010 - 2011

Prime Contractor
CFM Project Consulting Group Inc.